The object of this study is the development of an economic and technical viability study for the construction and operation of an underground parking area at the old swimming pool of Alexandroupoli.
The main actions include:
- Determination of Study Area
- Capture Existing Situation
- Recording parking characteristics – Field survey on 52 road sections of the study area
- Cost-Benefit Analysis (CBA)
Financier:
Municipality of Alexandroupolis